HOME > NEWS

Main hall of Xiaomeisha Sea World topped off

From: Shenzhen Daily | Updated:2022-06-02

The steel structure of Xiaomeisha Sea World’s main hall was topped off Tuesday afternoon after 180 days of construction, Shenzhen Special Zone Daily reported.

96dda144ad34598202bf65d6919b5da7cbef8433.jpeg

Xiaomeisha Sea World, Xiaomeisha seaside resort’s core engine, will reopen to the public in 2024. The then 20-year-old sea world was closed for reconstruction in December 2019.

The rebuilt ocean theme park will feature animal exhibits, science popularization and other attractions, and will cover around 60,000 square meters, with a total construction area of about 131,900 square meters. It includes structures called Oceanarium, Cetacearium, Exhibition and Service Center, Happy Theater, Sea Lion Encounter, Tourist Service Center, and two basement levels.

c2fdfc039245d6883f6b532007ad1114d31b2447.jpeg

The prototype of the sea world’s main hall is a pearly nautilus, with its core being the Green and Blue Hole, the country’s largest cylinder aquarium. The cylinder structure, at 11 meters in height and 15 meters in diameter, will hold 62,280 cubic meters of water and feature thousands of sardines and abyssal fishes.

In addition, residents and visitors will be able to reach Xiaomeisha seaside resort by Metro. Metro Line 8’s Phase II is expected to be completed in 2024.



attachment: